Jonathan May
/ Categories: Uncategorized

Project Update - Week of July 17th, 2023

Please see the below project update and list of activities scheduled for the week of July 17th 2023.

  • The general trades contractor will continue exterior framing & sheathing in Areas A & B. 
  • The general trades contractor will continue layout and interior framing on level 2 Areas A & B and Level 1 C. 
  • The waterproofing contractor will continue installation of waterproofing membrane in Areas A & B. 
  • The masonry contractor will continue installation of exterior masonry veneer in Areas A & B
  • The mechanical contractor will continue installation of overhead mechanical duct and piping on Level 2 Area A and Level 1 C. 
  • The plumbing contractor will continue installation of overhead and in-wall plumbing piping on Level 2 Areas D & A, and Level 1 Area D. 
  • The electrical contractor will continue installation of overhead rough-in on Level 2 Area A and continue in-wall rough-in on Level 2 Areas C & D. 
  • The fire protection contractor will continue installation of fire protection pipe on Level 1 Area C. 
  • The window contractor will continue with installation of the metal windows in Area C & D.
  • The metal panel contractor will continue installation of the exterior metal panel system on areas C&D facade. 
Previous Article Saturday Work - July 8th, 2023
Next Article Saturday Work - July 15th, 2023
Print
233 Rate this article:
No rating

Theme picker