Jonathan May
/ Categories: Uncategorized

Project Update - Week of June 19th, 2023

Please see the below project update and list of activities scheduled for the week of June 19th 2023

  • The concrete contractor shall complete the preperation of the Slab on Grades in Area A and Gymnasium of the building.
  • Concrete placement of of the gymnasium is tentatively scheduled for Thursday, 6.22. 
  • The misc metals contractor will continue erection of Stair C. 
  • The general trades contractor will continue exterior framing in areas A & B. 
  • The general trades contractor will continue layout and interior framing on level 2 areas C & D. 
  • The general trades contractor will continue layout of interior walls on level 2 A. 
  • The waterproofing contractor will continue installation of waterproofing membrane in areas A & B. 
  • The masonry contractor will continue installation of exterior masonry veneer in Areas C & D. 
  • The mechanical contractor will continue installation of overhead mechanical duct and piping on Level 2 Area A and Level 1 C. 
  • The plumbing contractor will continue installation of overhead and in-wall plumbing piping on Level 2 Areas C, D, & A, and Level 1 Area C. 
  • The electrical contractor will continue installation of overhead rough-in on Level 2 Area A and continue in-wall rough-in on Level 2 Areas C & D. 
  • The fire protection contractor will continue installation of fire protection pipe on Level 2 Area A. 
  • The roofing contractor will ocmmence installation of the roofing system on the Area B low roof. 
Previous Article Project Update - Week of June 12th, 2023
Next Article Project Update - Week of July 3rd 2023
Print
238 Rate this article:
No rating

Theme picker