Saturday Work - October 21, 2023

The project will be working on the site this Saturday 10/21/23. Activities will consist of the following:

  • The plumbing contractor will continue level 1 area A in-wall rough-in. 
  • The metal window contractor will continue interior weatherproofing. 
  • The electrical contractor will continue building's temporary heat system electrical connections. 
  • The general trades contractor will continue door frame installatin on level 2. 