Jonathan May / Friday, November 3, 2023 / Categories: Uncategorized Project Update - Week of November 6th, 2023 Please see the below project update and list of activities scheduled for the week of 11/6. The site contractor will continue subgrade preperation of the Outdoor Learning Lab The metal panel contractor will continue the main entrance canopy installation The window contractor will continue final setting and caulking of the storefront frames The general trades contractor will continue layout and metal framing of the level 1 lobby, cafeteria, and gym perimter wall The general trades contractor will continue taping of level 2 and level 1 area C & D The general trades contractor will continue drywall installation on level 1 area D & A The painting contractor will continue level 2 classrooms and commence level 2 corridors The painting contractor will continue preperation of the gym CMU for paint The ceiling contractor will continue ceiling grid installation on the level 2 auxilary rooms The fire protection contractor will continue overhead rough in of the exterior stem patio The plumbing contractor will continue level 1 A in wall rough-in and insulation install The mechanical contractor will continue VAV duct connections on level 1 C The mechanical contractor will continue setting radiant panels into ceiling grid The mechanical contractor will receive and set roof top unit curbs onto the roof The roofing contractor will tie the roofing system into the set roof top unit curbs The electrical contractor will continue overhead rough-in on level 1 area B gym and cafeteria The electrical contractor will commence installation of level 2 lighting area C lighting fixtures The tile contractor will continue installation of level 2 group bathroom floor and wall tile The tile contractor will commence level 2 individual bathroom floor tile Previous Article Saturday Work - November 4th, 2023 Next Article Project Update - Week of November 13th, 2023 Print 209 Rate this article: No rating