Project Update - Week of November 6th, 2023 Please see the below project update and list of activities scheduled for the week of 11/6. Jonathan May / Friday, November 3, 2023 0 34 Article rating: No rating The site contractor will continue subgrade preperation of the Outdoor Learning Lab The metal panel contractor will continue the main entrance canopy installation The window contractor will continue final setting and caulking of the storefront frames The general trades contractor will continue layout and metal framing of the level 1 lobby, cafeteria, and gym perimter wall The general trades contractor will continue taping of level 2 and level 1 area C & D The general trades contractor will continue drywall installation on level 1 area D & A The painting contractor will continue level 2 classrooms and commence level 2 corridors The painting contractor will continue preperation of the gym CMU for paint The ceiling contractor will continue ceiling grid installation on the level 2 auxilary rooms The fire protection contractor will continue overhead rough in of the exterior stem patio The plumbing contractor will continue level 1 A in wall rough-in and insulation install The mechanical contractor will continue VAV duct connections on level 1 C The mechanical contractor will continue setting radiant panels into ceiling grid The mechanical contractor will receive and set roof top unit curbs onto the roof The roofing contractor will tie the roofing system into the set roof top unit curbs The electrical contractor will continue overhead rough-in on level 1 area B gym and cafeteria The electrical contractor will commence installation of level 2 lighting area C lighting fixtures The tile contractor will continue installation of level 2 group bathroom floor and wall tile The tile contractor will commence level 2 individual bathroom floor tile Read more
Saturday Work - November 4th, 2023 The project will be working on the site this Saturday 11/4/23. Activities will consist of the following: Jonathan May / Friday, November 3, 2023 0 35 Article rating: No rating The plumbing contractor will continue level 1 A rough-in & insulation The mechanical contractor will continue VAV connections on level 1 C The electrical contractor will continue lighting control rough-in on level 2. Read more
Project Update - Week of October 23rd, 2023 Please see the below project update and list of activities scheduled for the week of 10/23. Jonathan May / Friday, October 20, 2023 0 56 Article rating: No rating The site contractor will continue the Outdoor Learning Lab subgrade preperation of concrete walkways. The site contractor will commence installed sewer line inspections. The window contractor will continue storefront and curtian wall installation. The metal panel contractor will continue the main canopy metal panel ceiling installation and the front entrance metal wall panel. The general trades contractor will continue interior metal framing and soffit erection on level 1 area A & B. The general trades contractor will continue in-wall blocking on level 1 area A. The general trades contractor will continue drywall and taping on level 1 C & D. The painting contractor will continue painting on level Level 1 area C. The ceiling contractor will continue ceiling grid install on level 2 area C and area D. The fire protection contractor will continue sprinkler overhead rough-in on level 1 area A & B. The plumbing contractor will continue in-wall rough in on level 1 area A. The mechanical contractor will continue tie-in of the level 1 area D VAVs. The mechanical contractor will continue in-wall duct insulation on level 1 A. The mechanical contractor will continue radiant heat panel installation in the level 2 area A. The mechanical contractor will continue setting radiant panel into ceiilng grid on level 1. The mechanical contractor will continue radiant heat panel final valve connections on level 2. The electrical contractor will continue main electric room buildout. The electrical contractor will continue overhead rough-in of the Lobby, Gym, & Cafeteria. The elevator contractor will continue elevator installation. The tile contractor will continue level 2 C & D group bathroom floor and wall tile. Read more
Saturday Work - October 21, 2023 The project will be working on the site this Saturday 10/21/23. Activities will consist of the following: Jonathan May / Friday, October 20, 2023 0 48 Article rating: No rating The plumbing contractor will continue level 1 area A in-wall rough-in. The metal window contractor will continue interior weatherproofing. The electrical contractor will continue building's temporary heat system electrical connections. The general trades contractor will continue door frame installatin on level 2. Read more
Project Update - Week of October 16th, 2023 Please see the below project update and list of activities scheduled for the week of 10/16. Jonathan May / Friday, October 13, 2023 0 57 Article rating: No rating The site contractor will continue the Outdoor Learning Lab subgrade preperation of concrete walkways. The masonry contractor will continue masonry install at the courtyard bumpouts. The window contractor will continue storefront installation. The metal panel contractor will continue the main canopy metal panel ceiling installation and the front entrance metal wall panel. The general trades contractor will continue interior metal framing and soffit erection on level 1 area A & B. The general trades contractor will continue in-wall blocking on level 1 area A. The general trades contractor will continue drywall and taping on level 1 C & D. The painting contractor will continue painting on level 2 area A and Level 1 area C. The ceiling contractor will continue ceiling grid install on level 2 area C and area D. The fire protection contractor will continue sprinkler overhead rough-in on level 1 area A & B. The fire protection contractor will commence the outdoor stem patio fire protection system. The plumbing contractor will continue in-wall rough in on level 1 area A. The plumbing contractor will complete the kitchen underslab piping. The mechanical contractor will continue tie-in of the level 1 area D VAVs. The mechanical contractor will continue in-wall duct insulation in level 1 A. The mechanical contractor will continue radiant heat panel installation in the level 2 area A. The mechanical contractor will continue setting radiant panel into ceiilng grid on level 2 Area D & A. The mechanical contractor will continue radiant heat panel final valve connections on level 2. The electrical contractor will continue main electric room buildout. The electrical contracotr will continue temporary power runs to the mechanical and elevator rooms. The electrical contractor will commence light fixture install on level 2 Area C Mock-up room. The elevator contractor will continue elevator installation. The tile contractor will continue level 2 C & D group bathroom floor and wall tile. Read more