Saturday Work - November 5th 2022

Tripp McElroy III 0 229 Article rating: No rating

The project will be working on the site this Saturday 11/5/22.  Activities will consist of the following: 

  • The site contractor shall be prepping and raking the loam at the perimeter of the long jump areas and placing the hydroseed.    

This weekend work schedule has been communicated and coordinated with the Town Manager's Office.

Project Update - Week of 11/7/22

Tripp McElroy III 0 254 Article rating: No rating

Please see the below project update and list of activities scheduled for the week of November 7th 2022. 

  • The site contractor will continue with installation of foundation insulation and backfill of foundation walls in Area B of the building.
  • The site contractor shall continue with backfilling to subgrade in Area A, and commence with excavation and sub-grade prep for UG Plumbing in this area.
  • Due to the recent rain events the fine grading and paving for the fire access roadway around the perimeter of the new building was rescheduled to be completed on Monday 11/7.   
  • The site contractor shall continue with excavation and subgrade prep of the electrical hand holes around the perimeter of the site to support the future site lighting.
  • The concrete contractor will continue with clean-up and demobilization efforts this week.
  • The plumbing enabling contractor shall commence with lay-out and installation of UG Plumbing in Area A of the building.
  • The electrical enabling contractor shall continue with the electrical ductbank installation from the BESS vault location to the building and continue with the installation of conduit and electrical hand holes around the perimeter of the site to support the future site lighting.
  • Groton Electric Light Department is tentatively scheduled to commence the pulling of their primary cable from the new utility poles adjacent to Champney Street to the new transformer pad location on Monday 11/7.  
  • Due to the holiday on Friday 11/11 there will not be any work activities on the project site.  

Saturday Work - October 29th 2022

Tripp McElroy III 0 271 Article rating: No rating

The project will be working on the site this Saturday 10/29/22.  Activities will consist of the following: 

  • The site contractor will be completing general clean-up and placing remaining loam materials around the long jump areas and misc landscape areas at the perimeter of the track.  
  • The site contractor shall be installing drainage elements at the West perimeter/edge of the athletic field.    

This weekend work schedule has been communicated and coordinated with the Town Manager's Office.

Project Update - Week of October 31st 2022

Tripp McElroy III 0 265 Article rating: No rating

Please see the below project update and list of activities scheduled for the week of October 31st 2022. 

  • The athletic field storage shed overhead door shall be installed.  
  • The site contractor will be hydroseeding around the long jump areas and other misc landscape areas at the perimeter of the track.  
  • The site contractor will continue with installation of foundation insulation and backfill of foundation walls in Area B and commence this effort at the loading dock foundation.  
  • The site contractor shall commence with backfilling to subgrade in Area A, in preparation for UG Plumbing excavation and installation the week of 11/7.
  • The site contractor shall complete the excavation and construction of retaining wall #2 on the South elevation of the building.
  • The site contractor shall continue prepping and fine grading the fire access loop road around the perimeter of the building.  The asphalt binder for the roadway is currently scheduled to placed on Thursday 11/3 or Friday 11/4. 
  • The site constractor shall commence with excavation and subgrade prep of the electrical hand holes around the perimeter of the site to support the future site lighting.
  • The concrete contractor will continue forming and pouring the exterior footings/piers at the Main Entrance Canopy and STEM Patio areas of the building.  These activities will complete the building foundation scope for the project.  The concrete contractor will commence with clean-up and demobilization efforts at the end of the week.
  • The plumbing enabling contractor shall complete the installation of the underground plumbing in Area D of the building.  Inspection and sign-off of this work with the Town's Plumbing Inspector is tentatively scheduled for Thursday 11/3.
  • The electrical enabling contractor shall continue with the electrical ductbank installation from the BESS vault location to the building and commence with the installation of conduit and electrical hand holes around the perimeter of the site to support the future site lighting.

Saturday Work - October 22nd 2022

Tripp McElroy III 0 258 Article rating: No rating

The project will be working on the site this Saturday 10/22/22.  Activities will consist of the following: 

  • Construction of the new athletic storage shed shall continue.
  • The site contractor shall be moving and processing soil materials onsite in preparation for subgrade prep and asphalt paving scheduled to be completed in the upcoming two weeks.

This weekend work schedule has been communicated and coordinated with the Town Manager's Office.