Project Update - Week of September 19th 2022 Jonathan May / Friday, September 16, 2022 0 265 Article rating: No rating Please see the below project update and list of activities scheduled for the week of September 19th 2022. The irrigation with complete final position of irrigation heads. The track surface contractor will begin placing of the synthetic track surface. The electrical contractor in coordiantion with GELD will complete the ductbanks to Champney Street and connect to the new utility poles provided by GELD. The concrete contractor will continue forming and placing concrete foundations in Areas A & B. Concrete placements are tentatively scheduled for Monday, 9/19, Wednesday, 9/21, and Friday, 9/23. The site contractor will continue exterior insulation install and backfill of the foundation walls in Areas C & D. The site contractor will continue foundation excavation of Areas A & B. The site contractor will continue utility installation below the proposed perimeter access road. The site contractor will continue various grading activities around the site. Read more
Project Update - Week of August 29th 2022 Jonathan May / Saturday, August 27, 2022 0 246 Article rating: No rating Please see the below project update and list of activities scheduled for the week of 8/29. Exporting excess materials from the site shall continue this week. The fencing contractor will complete the athletic field retaining wall fence installation. The irrigation system will be completed The drainage structure covers will be installed The electrical contractor will commence providing power to the new athletic field shed location The concrete contractor will continue foundation construction for the classroom wings Area C & D. The site contractor will continue to excavate the Area A & B foundations. The electrical and site contractors will continue the electrical ductbank installation down Champney Street. The site contractor will continue various grading activities around the site. Read more
Project Update - Week of May 13th 2022 Please see the below project update and list of activities scheduled for the week of 5/16. Jonathan May / Friday, May 13, 2022 0 355 Article rating: 5.0 Complete Con-Com and Stormwater Agent inspection of erosion control measures. The site contractor will begin stripping topsoil at the new track & field location. The site contractor will begin demolition of existing field equipment, fencing, benches, etc. Electrical and plumbing contractors will complete the construction trailer electrical and plumbing hookups. Read more
Project Update - Week of May 6th 2022 Please see the below project update and list of activities scheduled for the week of 5/9. Jonathan May / Friday, May 6, 2022 0 329 Article rating: 5.0 The fence contractor will complete the driven post and fence installation. The site contractor will complete the installation of erosion control measures along the perimeter of the construction site. The project will conduct the perimeter erosion control and SWPPP inspections with the town Conservation Committee Inspector and the Storm Water Advisory Agent. The site contractor will complete the implementation of the temporary construction access road. The site contractor will also mobilize additional earth moving equipment. Read more
Project Update - Week of April 29th 2022 Jonathan May / Friday, April 29, 2022 0 371 Article rating: 5.0 Site mobilization activities have continued this week. Please see the below project update and list of activities scheduled for the week of 5/2. The Surveyor's and layout engineers will continue to establish the construction area boundaries allowing all further work to be laid out. The temporary construction fence installation will continue: Continue layout of the remaining construction fence around the rear of the site. Continue driving posts and hanging of fence along the rear of the site. Begin preparation for all remaining auxiliary construction fence access gates. The site contractor will commence instllation of erosion control measures. The temporary construction access road activities will commence. Initial tree removal will commence. Read more