Project Update - Week of June 6th, 2023 Please see the below project update and list of activities scheduled for the week of June 6th, 2023. Jonathan May / Monday, June 5, 2023 0 245 Article rating: No rating The sitework contractor will commence preperation of the Slab on Grade in Area A and the Gym The general trades contractor will continue exterior framing in areas A & B. The waterproofing contractor will continue installation of waterproofing membrane in areas A & B. The masonry contractor will continue installation of masonry veneer in areas C & D. The general trades contractor will continue interior framing in Area C & D Level 2 classroom wings. The mechanical contractor will continue installation of overhead mechanical duct and pipping in level 2 A and level 1 C & D. The plumbing contractor will continue installation of overhead and in-wall plumbing piping in level 2 C, D, & A, and level 1 C. The electrical contractor will continue installation of temporary lighting in the Gym. The electrical contractor will continue installation of overhead rough-in on level 2 A and in-wall rough-in on level 2 C&D. The fire protection contractor will continue installation of fire protection pipe on level 2. Read more
Project Update - Week of May 22nd 2023 Please see the below project update and list of activities scheduled for the week of May 22nd 2023 Tripp McElroy III / Friday, May 19, 2023 0 272 Article rating: No rating The general trades contractor will continue layout, framing & sheathing of exterior walls on the 1st & 2nd levels of Areas C & D. The general trades contractor shall continue with layout and commence top track installation of interior wall framing on the 2nd levels of Areas C & D. The mechanical contractor will continue with the lay-out of duct hangers on the second level of Areas C & D of the building and continue with the installation of ductwork & mechanical piping. The plumbing contractor will continue with the lay-out and installation of plumbing piping on the second level of Areas C & D of the building. The electrical contractor shall continue with the installation of temp power and lighting provisions on the first level of Areas A & B of the building. The electrical contractor shall continue with in-wall electrical rough-in at the gymnasium CMU walls. The electrical contractor shall continue with the overhead rough-in of electrical feeders on the second level of Areas C & D of the building. The fire protection contractor shall commence with overhead rough-in of sprinkler piping on the second level of Area C. The masonry contractor shall continue construction of the CMU walls in the gymnasium. The masonry shall continue with masonry veneer starter course on Area C of the building. Masonry veneer activites on the exterior mock-up shall continue next week. The waterproofing contractor shall continue with the installation of the waterproofing membrane on the exterior walls of Areas C & D of the building. Read more
Project Update - Week of May 8th 2023 Please see the below project update and list of activities scheduled for the week of May 8th 2023 Tripp McElroy III / Saturday, May 6, 2023 0 269 Article rating: No rating The general trades contractor shall continue with the lay-out and installation of roof blocking at mechanical equipment and penetration locations on the cafeteria roof. The general trades contractor will continue layout, framing & sheathing of exterior walls on the 1st & 2nd levels of Areas C & D. The general trades contractor shall continue with layout of interior wall framing on the 2nd levels of Areas C & D. The concrete contractor shall continue with slab on grade prep activities in Area A & B of the building. Slab on grade placement in Area B of the building is tentatively scheduled for Thursday 5/11. Concrete trucks are scheduled to arrive to the site at 9AM after morning drop-off for the campus is complete. The mechanical contractor will continue with the lay-out of duct hangers on the second level of Areas C & D of the building and continue with the installation of ductwork & mechanical piping. The plumbing contractor will continue with the lay-out and installation of plumbing piping on the second level of Areas C & D of the building. The roofing contractor shall continue with the installation of roof dense deck and AVB on Areas B of the building. The electrical contractor shall continue with the installation of temp power and lighting provisions on the first level of Areas C & D of the building. The electrical contractor shall continue with in-wall electrical rough-in at the gymnasium CMU walls. The electrical contractor shall commence with the overhead rough-in of electrical feeders on the second level of Areas C & D of the building. The masonry contractor shall continue construction of the CMU walls in the gymnasium. The waterproofing contractor shall continue with the installation of the waterproofing membrane on the exterior walls of Area C of the building. Read more
Saturday Work - May 6th 2023 The project will be working on the site this Saturday 5/6/23. Activities will consist of the following: Tripp McElroy III / Friday, May 5, 2023 0 254 Article rating: No rating The mechanical contractor shall continue with the installation of mechanical piping on the second level of Area C in the building. The general trades contractor shall continue with the installation of exterior sheathing on Areas C & D of the building. This weekend work schedule has been communicated and coordinated with the Town Manager's Office. Read more
Project Update - Week of May 1st 2023 Please see the below project update and list of activities scheduled for the week of May 1st 2023 Tripp McElroy III / Friday, April 28, 2023 0 293 Article rating: No rating The site contractor shall complete the excavation and sub-grade prep for the remaining UG electrical in Area B of the building. The site contractor will continue with the backfill of crushed stone and compaction in Area A in preparation for slab on grade prep. The general trades contractor shall continue with the lay-out and installation of roof blocking at mechanical equipment and penetration locations on Areas A & B of the building. The general trades contractor will continue layout, framing & sheathing of exterior walls on the 1st & 2nd levels of Areas C & D. The general trades contractor shall set and secure the hollow metal door frames in the gymnasium walls. The concrete contractor shall continue with slab on grade prep activities in Area A & B of the building. The mechanical contractor will continue with the lay-out of duct hangers on the second level of Areas C & D of the building and continue with the installation of ductwork & mechanical piping. The plumbing contractor will continue with the lay-out and installation of plumbing piping on the second level of Areas C & D of the building. The roofing contractor shall continue with the installation of roof dense deck and AVB on Areas A & B of the building. The electrical contractor shall continue with the installation of temp power and lighting provisions on the first level of Areas C & D of the building. The electrical contractor shall commence with in-wall electrical rough-in at the gymnasium CMU walls. The masonry contractor shall commence construction of the CMU walls in the gymnasium. The waterproofing contractor shall commence with the installation of the waterproofing membrane on the exterior walls of Area C of the building. Read more