Saturday Work - September 16th, 2023 The project will be working on the site this Saturday 9/16/23. Activities will consist of the following: Jonathan May / Thursday, September 14, 2023 0 227 Article rating: No rating The general trades contractor will install level 1 door frames. The general trades contractor will commence installation of the area C exterior framing and sheathing leaveout. The electrical contractor will commence level 2 area C classroom overhead fixture accessory installation. The plumbing contractor will continue gas line installation in the gym and ktichen. The plumbing contractor will continue in-wall rough in on level 1 area D. The window contractor will continue weatherproofing the area C level 1 windows. Read more
Project Update - Week of September 18th, 2023 Please see the below project update and list of activities scheduled for the week of 9/18. Jonathan May / Thursday, September 14, 2023 0 234 Article rating: No rating The site contractor will commence subgrade preperation of the outdoor learning lab concrete walks. The masonry contractor will continue masonry install at the courtyard bump outs. The window contractor will continue installation of windows on level 1 area B. The window contractor will continue waterproofing of installed windows on level 1 area C &D. The window contractor will commence installation of exterior storefronts. The metal panel contractor will continue metal panel installation of the low roof translucent panel perimeter and the area A west bumpout. The general trades contractor will continue interior metal framing on level 1 area A. The general trades contractor will continue in-wall blocking on level 1 area A. The general trades contractor will commence interior insulation on level 1 area C. The general trades contractor will continue gypsum board installation on level 2 area A and level 1 area C & D The general trades contractor will continue taping on level 2 area A. The general trades contractor will continue buildout of the telecommunciations rooms. The painting contractor will continue painting of level 2 area C & D. The fire protection contractor will continue sprinkler rough in on level 1 area A. The plumbing contractor will continue in-wall rough in on level 1 Area D & A. The plumbing contractor will continue pipe insullation on level 2 A and level 1 C. The plumbing contractor will continue installation of the cafeteria canopy roof drains. The plumbing and mechanical contractor will continue buildout of the mechanical room. The plumbing contractor will commence kitchen underground installation. The mechanical contractor will continue installation of the level 2 VAVs. The mechanical contractor will continue duct insulation on level 1 area D and C. The mechanical contractor will commence radiant heat panel installation in the level 2 area C classrooms. The electrical contractor will continue buildout of the electric rooms. The electrical contractor will continue overhead rough in in the gym and cafeteria. The electrical contractor will continue in-wall rough in on level 1 area A. The electrical contractor will commence classroom overhead fixture accessory installation on level 2 area C. The electrical contractor will continue telecommunications room buildout. Read more
Project Update - Week of September 11th, 2023 Please see the below project update and list of activities scheduled for the week of 9/11. Jonathan May / Friday, September 8, 2023 0 221 Article rating: No rating The site contractor will commence subgrade preperation of the loading dock ramp and stairs. The roofing contractor will continue installation of the canopy roofing and the metal roof edge. The masonry contractor will continue masonry install at the courtyard bump outs. The window contractor will continue installation of windows on level 1 area B. The window contractor will continue waterproofing of installed windows on level 1 area C &D. The metal panel contractor will continue metal panel installation of the low roof translucent panel perimeter. The general trades contractor will continue interior metal framing on level 1 area A. The general trades contractor will continue interior insulation on level 2. The general trades contractor will continue gypsum board installation on level 2 area A and level 1 area C & D The general trades contractor will continue taping on level 2 area D & A. The general trades contractor will continue buildout of the telecommunciations rooms. The painting contractor will commence painting of level 2 area C & D. The concrete contractor will continue preperation of the loading dock ramp and stairs. The concrete contractor will pour the platform and stair B landing stairs. The fire protection contractor will continue sprinkler rough in on level 1 area A. The plumbing contractor will continue in-wall rough in on level 1 Area D & A. The plumbing contractor will continue pipe insullation on level 2 A and level 1 C. The plumbing contractor will continue installation of the cafeteria canopy roof drains. The plumbing and mechanical contractor will continue buildout of the mechanical room. The mechanical contractor will continue installation of the level 2 VAVs. The mechanical contractor will continue duct insulation on level 1 area D and C. The electrical contractor will continue buildout of the electric rooms. The electrical contractor will continue overhead rough in in the gym and cafeteria. The electrical contracotr will continue telecommunications room buildout. The electrical contractor will continue in-wall rough in on level 1 area D. Read more
Saturday Work - August 26th, 2023 The project will be working on the site this Saturday 8/26/23. Activities will consist of the following: Jonathan May / Thursday, August 24, 2023 0 265 Article rating: No rating The plumbing contractor will continue gas pipe installation in the mechanical room. The mechanical contractor will continue mechanical pipe installation in the mechanical room. Read more
Project Update - Week of August 28th, 2023 Please see the below project update and list of activities scheduled for the week of August 28th, 2023 Jonathan May / Thursday, August 24, 2023 0 244 Article rating: No rating The metal panel contractor will continue installation of the the Area D metal panel bump out. The window contractor will continue waterproofing of the window systems. The window contractor will continue window installation on level 2 A. The roofing contractor will continue installation metal roof edge install and low roof roofing system install. The general trades contractor will complete the low roof and main canopy roof edge blocking. The general trades contractor continue level 2 area A perimeter wall insulation. The general trades contractor will continue drywall installation on level 2 area D & A. The general trades contractor will continue in-wall blocking installation on level 1 C. the general trades contractor will continue taping in level 2 area C. The electrical contractor will continue electrical room build-out. The electrical contractor continue in-wall electrical rough-in on level 1 area D. The fire protection contractor will continue sprinkler pipe rough-in on level 1 area A & B. The mechanical contractor will continue overhead duct installation on level 1 Area A. The mechanical contractor will continue in-wall duct installation on level 2 area B and level 1 area C. The mechanical controls contractor will continue in-wall rough-in on level 1 area C & D. The mechanical and plumbing contractors will continue mechanical room build-out. The plumbing contractor will continue plumbing pipe installation on level 1 area A. The concrete contractor will continue preperation and pouring of the platform and stair B subfloor concrete stairs. Read more