Saturday Work - October 7th, 2023 The project will be working on the site this Saturday 10/7/23. Activities will consist of the following: Jonathan May / Thursday, October 5, 2023 0 226 Article rating: No rating The electrical contractor will continue overhead light fixture control installation on level 2 A. The plumbing contractor will continue level 1 area A in-wall rough-in. Read more
Project Update - Week of October 10th, 2023 Please see the below project update and list of activities scheduled for the week of 10/9. Jonathan May / Thursday, October 5, 2023 0 204 Article rating: No rating The site contractor will complete kitchen underslab stone preperation and electrical underslab conduit pathways. The site contractor will continue the Outdoor Learning Lab subgrade preperation of concrete walkways. The masonry contractor will continue masonry install at the courtyard bumpouts. The window contractor will continue storefront installation on the classroom wing loop road elevations. The metal panel contractor will continue the main canopy metal panel ceiling installation. The general trades contractor will continue interior metal framing and soffit erection on level 1 area A. The general trades contractor will continue in-wall blocking on level 1 area A. The general trades contractor will continue drywall and taping on level 1 C. The painting contractor will continue painting on level 2 area D & A. The ceiling contractor will continue ceiling grid install on level 2 Area C. The fire protection contractor will continue sprinkler overhead rough-in on level 1 area A & B. The plumbing contractor will continue pipe insulation on level 1 area D. The plumbing contractor will continue in-wall rough in on level 1 area A. The mechanical contractor will continue tie-in of the level 1 area C VAVs. The mechanical contractor will continue in-wall duct insulation in level 1 A. The mechanical contractor will continue radiant heat panel installation in the level 2 area A. The mechanical contractor will continue setting radiant panel into ceiilng grid on level 2 Area C. The electrical contractor will continue classroom lighting control rough in on level 2 area A. The electrical contractor will commence light fixture install on level 2 Area C Mock-up room. The elevator contracotr will commence elevator installation. Read more
Project Update - Week of October 2. 2023 Please see the below project update and list of activities scheduled for the week of 10/2. Jonathan May / Thursday, September 28, 2023 0 246 Article rating: No rating The site contractor will complete backfill of kitchen underground execation. The site contractor will commence preperation of the kitchen slab on grade The site contractor will commence the Outdoor Learning Lab subgrade preperation of concrete walkways. The masonry contractor will continue masonry install at the courtyard bumpouts. The window contractor will continue storefront installation on the classroom wing courtyard elevations. The metal panel contractor will continue metal panel installation at the area C south bumpout and the low roof. The metal panel contractor will commence the main canopy metal panel ceiling installation. The general trades contrractor will continue interior metal framing on level 1 area A. The general trades contractor will continue in-wall blocking on level 1 area A. The general trades contractor will continue hanging drywall on level 1 area C. The general trades contractor will continue taping on level 1 Area C. The painting contractor will continue painting on level 2 area D & A. the fire protection contractor will continue sprinkler overhead rough-in on level 1 area A & B. The plumbing contractor will continue pipe insulation on level 1 area C and D. The plumbing contractor will continue in-wall rough in on level 1 area A. The mechanical contractor will continue tie-in of the level 2 VAVs. The mechanical contractor will commence level 1 VAV tie-in. The mechanical contractor will continue in-wall duct in level 1 A. The mechanical contractor will continue radiant heat panel installation in the level 2 area D & A classrooms. The electrical contractor will commence overhead rough-in in the gym. The electrical contractor will continue classroom lighting control rough in on level 2 area D & A. Read more
Saturday Work - September 23rd, 2023 The project will be working on the site this Saturday 9/23/23. Activities will consist of the following: Jonathan May / Friday, September 22, 2023 0 224 Article rating: No rating The site contractor will commence kitchen underground plumbing excavation The plumbing contractor will continue gas pipe installation to the kitchen. The plumbing contractor will continue in-wall rough in on level 1 area D. The electrical contractor will continue lighting control rough in on level 2 area C & D. Read more
Project Update - Week of Septemer 25th, 2023 Please see the below project update and list of activities scheduled for the week of 9/25. Jonathan May / Friday, September 22, 2023 0 265 Article rating: No rating The site contractor will commence kitchen underground execation. The masonry contractor will continue masonry install at the courtyard bumpouts. The window contractor will continue storefront installation on the classroom wing courtyard elevations. The metal panel contractor will continue metal panel installation at the area C south bumpout and the low roof. The general trades contrractor will continue interior metal framing on level 1 area A. The general trades contractor will continue in-wall blocking on level 1 area D and A. The general trades contractor will continue hanging drywall on level 1 area C. The general trades contractor will commence taping on level 1 Area C. The painting contractor will contineu painting on level 2 area C & D. the fire protection contractor will continue sprinkler overhead rough-in on level 1 area A & B. The plumbing contractor will continue kitchen underground plumbing. The plumbing contractor will continue pipe insulation on level 1 area C. The plumbing contractor will continue in-wall rough in on level 1 area A. The mechanical contractor will continue tie-in of the level 2 VAVs. The mechanical contractor will continue in-wall duct in level 1 A. The mechanical contractor will continue radiant heat panel installation in the level 2 area C classrooms. The electrical contractor will continue in-wall rough in on level 1 area A. The electrical contractor will continue classroom lighting control rough in on level 2 area C & D. Read more