Project Update - Week of May 20th, 2024 Please see the below project update and list of activities scheduled for the week of May 20th, 2024 Jonathan May / Friday, May 17, 2024 0 94 Article rating: 5.0 The concrete contractor will continue forming and pouring of the front entrance concrete. The landscape contractor will continue spreading of loam, layout of trees and shrubs, and finalize irrigiation system install. The landscape contractor will continue installation of the kindergarten playground. The misc. metals contractor will continue the installation of the exterior rails. The waterproofing contractor will continue exterior expansion joint caulking. The resilient flooring contractor will continue the level 1 lobby flooring. The painting contractor will continue final patching and painting of level 1. The ceiling contractor will continue installation of ceiling tiles on level 2. The millwork and casework contractor will continue installation of the stair B and platform stair treads and media center seating. The plumbing contractor will be setting hot water valves at all sinks. The mechanical contractor will continue with equipment commissioning of the building's hot water system. The mechanical contractor will continue balancing the supply and return air system. The controls contractor will continue integrating equipment into the building management system. The controls contractor will commense building commissioning. The fire protection contractor will continue setting fire protection heads into completed ceilings on level 1. The fire protection contractor will commence sprinkler head install in the stem patio ceiling. The electrical contractor will commence stem patio light installation. The electrical contractor will commence security system programming. The specialties contractor will continue installation of the toilet accessories and partitions. Read more
Project Update - Week of May 13th, 2024 Please see the below project update and list of activities scheduled for the week of May 13th, 2024 Jonathan May / Friday, May 10, 2024 0 103 Article rating: 5.0 The site contractor will continue preperation of the perimeter front concrete subgrade and setting of light pole bases. The concrete contractor will continue forming and pouring of the front entrance concrete. The landscape contractor will continue spreading of loam and layout of trees and shrubs. The landscape contractor will continue installation of the kindergarten playground. The misc. metals contractor will continue the installation of the exterior rails. The waterproofing contractor will continue exterior expansion joint caulking. The general trades contractor will continue framing of the stem patio ceiling. The resilient flooring contractor will continue the level 1 lobby flooring. The painting contractor will continue final painting of level 1. The ceiling contractor will continue installation of ceiling tiles. The millwork and casework contractor will continue installation of the stair B and platform stair treads and media center seating. The plumbing contractor will continue final connections of kitchen equipment. ALL MEP contractor's will continue final connections to the food service equipment. The mechanical contractor will continue with equipment commissioning. The controls contractor will continue integrating equipment into the building management system. The controls contractor will commense building commissioning. The fire protection contractor will continue setting fire protection heads into completed ceilings on level 1 The specialties contractor will continue installation of the toilet accessories and partitions. The shade contractor will continue shade installation in the level 1 classrooms. Read more
Project Update - Week of April 22nd, 2024 Please see the below project update and list of activities scheduled for the week of April 22nd, 2024 Jonathan May / Friday, April 19, 2024 0 109 Article rating: No rating The site contractor will continue preperation of the perimeter front concrete subgrade The concrete contractor will continue pouring of the outdoor learning lab. The waterproofing contractor will continue exterior expansion joint caulking. The general trades contractor will continue level 1 door and hardware installation. The general trades contractor will commence insulation and framing of the stem patio ceiling. The resilient flooring contractor will continue the level 1 corridor flooring. The painting contractor will continue final painting of the level 2 and level 1. The ceiling contractor will continue the lobby ceiling grid and panel installation. The ceiling contractor will continue coordinating with the MEP trade partners for ceiling tile device installation on level 1. The millwork and casework contractor will continue installation of the cafeteria acoustic panels. The millwork and casework contractor will continue the platform subfloor installation and the media center seating. The plumbing contractor will continue level 1 classroom sink installation and kitchen equipment connections. ALL MEP contractor's will continue final connections to the food service equipment. The mechanical contractor will continue with equipment commissioning. The controls contractor will continue integrating equipment into the building management system. The electrical contractor will continue installation of the lobby light fixtures. The fire protection contractor will continue setting fire protection heads into completed ceilings on level 1 The specialties contractor will continue installation of the toilet accessories and partitions. The shade contractor will continue shade installation in the level 1 classrooms. Read more
Project Update - Week of April 15th, 2024 Please see the below project update and list of activities scheduled for the week of April 15th, 2024 Jonathan May / Friday, April 12, 2024 0 104 Article rating: No rating The site contractor will continue preperation of the perimeter road landscape area and front concrete subgrade The concrete contractor will pour the first third of the outdoor learning lab and pour the front entry stairs. The waterproofing contractor will continue waterproofing of the stem patio. The general trades contractor will continue level 1 door and hardware installation. The resilient flooring contractor will continue the level 1 corridor flooring. The painting contractor will continue final painting of the level 2. The ceiling contractor will continue the lobby ceiling grid and panel installation. The ceiling contractor will continue coordinating with the MEP trade partners for ceiling tile device installation on level 1. The millwork and casework contractor will continue installation of the cafeteria acoustic panels. The millwork and casework contractor will continue the platform subfloor installation and the media center seating. The plumbing contractor will continue level 1 classroom sink installation and kitchen equipment connections. The mechanical contractor will continue with equipment commissioning. The controls contractor will continue integrating equipment into the building management system. The electrical contractor will continue installation of the lobby light fixtures. The fire protection contractor will continue setting fire protection heads into completed ceilings on level 1 The specialties contractor will continue installation of the toilet accessories and partitions. The shade contractor will continue shade installation in the level 1 classrooms. Read more
Saturday Work - April 6th, 2024 The project will be working on the site this Saturday 4/6/24. Activities will consist of the following: Jonathan May / Friday, April 5, 2024 0 111 Article rating: No rating The general trades contractor will continue misc. tapping activities on level 1. The general trades contractor will continue framing the stem patio ceiling. The general trades contractor will commence removal of the loading dock platform. Read more