Project Update - Week of March 25th, 2024 Please see the below project update and list of activities scheduled for the week of March 25th, 2024 Jonathan May / Friday, March 22, 2024 0 200 Article rating: No rating The site contractor will continue the outdoor learning lab site preperation. The general trades contrctor will continue installation of interior and exterior expansion joints. The waterproofing contrator will continue caulking of exterior masonry and metal panel joints. The concrete contractor will continue forming the front entrance stair foundations and outdoor learning lab concrete sidewalks. The masonry contractor will continue erecting the final masonry elevation at the project's loading and trashout area. The general trades contractor will continue level 1 door and hardware installation. The general trades contractor will continue taping of stair A closure walls. The resilient flooring contractor will continue the level 2 corridor flooring and commence level 1 corridor. The painting contractor will continue final painting of the level 2 area C classrooms. The painting contractor will continue final caulking of all windows. The ceiling contractor will continue kitchen and lobby ceiling installation. The ceiling contractor will continue coordinating with the MEP trade partners for ceiling tile device installation on level 1 and 2. The millwork and casework contractor will continue level 1 admin area casework install. The plumbing contractor will continue level 1 classroom sink installation. The mechanical contractor will install the RTU catwalks. The mechanical contractor will install the radiant heat panels in the lobby. The electrical contractor will continue installation of the lobby and kitchen light fixtures. The electrical contractor will continue initial inspections and testing of the fire alarm system. The fire protection contractor will continue setting fire protection heads into completed ceilings on level 1 The specialties contractor will continue installation of the toilet partitions. The misc. metals contractor will continue installation of the interior handrails. The epoxy flooring contractor will commence the kitchen floor installation. The shade contractor will commence shade installation in the level 2 classrooms. The gym flooring contractor will commence the gym subfloor installation. Read more
Saturday Work - March 9th, 2024 The project will be working on the site this Saturday 3/9/24. Activities will consist of the following: Jonathan May / Friday, March 8, 2024 0 193 Article rating: No rating The electrical contractor will work with GELD to energize the project's permenant electrical service. Read more
Project Update - Week of March 11th, 2024 Please see the below project update and list of activities scheduled for the week of March 11th, 2024 Jonathan May / Friday, March 8, 2024 0 223 Article rating: No rating The general trades contractor will continue installation of level 2 and commence level 1 doors and hardware. The general trades contractor will continue metal framing and drywall install of the Stair C, D, & A closure walls. The general trades contractor will frame & drywall the main stair knee wall ahead of floor finishes. The resilient flooring contractor will continue the level 2 corridor flooring. The painting contractor will continue final painting of the level 2 area C classrooms. The ceiling contractor will continue cafeteria and kitchen ceiling installation. The ceiling contractor will continue coordinating with the MEP trade partners for ceiling tile device installation on level 1 and 2. The millwork and casework contractor will continue level 1 admin area casework install. The millwork and casework contractor will commence the stem patio cubby installation. The plumbing contractor will continue level 1 classroom sink installation. The plumbing and mechanical contractor will continue installing valve tags on level 2. The mechanical contractor will continue ceiling diffuser installation on level 1. The mechanical contractor will continue installing the cafeteria wall diffusers. The mechanical contractor will install the gym fan blades. The electrical contractor will continue installation of the lobby and kitchen light fixtures. The electrical contractor will commence energizing electrical panels supported by permenant power. The electrical contractor will continue fire alarm finish installation on level 1. The fire protection contractor will continue setting fire protection heads into completed ceilings on level 1 and Media Center. The tile contractor will continue level 1 corridor and admin area tile. The tile contractor will commence the cafeteria wall tile. The specialties contractor will continue installation of the toilet partitions. The site contractor will commence courtyard sitework preperation. The waterproofing and masonry contractor will re-mobilize to close in the project's level 2 loadout elevation. The misc. metals contractor will commence installation of the main stair railings. Read more
Project Update - Week of March 4th, 2024 Please see the below project update and list of activities scheduled for the week of March 4th, 2024 Jonathan May / Friday, March 1, 2024 0 229 Article rating: No rating The general trades contractor will continue installation of level 2 doors and hardware. The general trades contractor will continue metal framing and drywall install of the Stair C, D, & A closure walls. The resilient flooring contractor will continue flooring installation of the level 1 area D classrooms. The resilient flooring contractor will commence the level 2 area D corridor flooring. The painting contractor will continue painting the level 1 admin area, lobby, and cafeteria. The painting contractor will continue final painting of the level 2 area C classrooms. The ceiling contractor will continue ceiling grid installation on level 1 admin area, media center, cafeteria, and lobby. The ceiling contractor will continue coordinating with the MEP trade partners for ceiling tile device installation on level 1 and 2. The millwork and casework contractor will continue level 1 area D classroom, corridor, and media center casework installation. The millwork and casework contractor will continue level 1 area a Admin Area caswork installation. The metal windows contractor will continue installation of the interior storefronts in the Media Center and Admin area. The plumbing contractor will continue with level 2 classroom and bathroom sink installation. The plumbing contractor will commence level 1 classroom sink installation. The plumbing contractor will continue final plumbing connections in the Mechanical Room. The plumbing and mechanical contractor will continue installing valve tags on level 2. The mechanical contractor will continue ceiling diffuser installation on level 1. The mechanical contractor will continue installing the cafeteria wall diffusers. The electrical contractor will continue installation and wiring of level 1 admin area, media center, and cafeteria light fixtures. The electrical contractor will continue fire alarm finish installation on level 1. The electrical contractor will continue making final electrical wiringing connections in the main electric room. The fire protection contractor will continue setting fire protection heads into completed ceilings on level 1 and Media Center. The tile contractor will continue level 1 corridor and admin area tile. The tile contractor will continue level 1 group bathroom floor and wall tile. The specialties contractor will continue markerboard and tack board installation in the level 2 and level 1 classrooms. Read more
Project Update - Week of February 26th, 2024 Please see the below project update and list of activities scheduled for the week of February 26th 2024 Jonathan May / Thursday, February 22, 2024 0 206 Article rating: No rating The general trades contractor will continue installation of level 2 doors and hardware. The general trades contractor will continue metal framing and drywall install of the Stair C & D closure walls. The resilient flooring contractor will continue flooring installation of the level 1 area D classrooms. The resilient flooring contractor will commence the level 2 area C corridor flooring. The painting contractor will continue painting the level 1 admin area, lobby, and cafeteria. The painting contractor will commence final painting of the level 2 area C classrooms. The ceiling contractor will continue ceiling grid installation on level 1 admin area, media center, and cafeteria. The ceiling contractor will continue coordinating with the MEP trade partners for ceiling tile device installation on level 1 and 2. The millwork and casework contractor will continue level 1 area D classroom, corridor, and media center casework installation. The millwork and casework contractor will continue level 1 area a Admin Area caswork installation. The metal windows contractor will continue installation of the interior storefronts in the Media Center and Admin area. The plumbing contractor will continue with level 2 classroom and bathroom sink installation. The plumbing contractor will commence level 1 classroom sink installation. The plumbing contractor will continue final plumbing connections in the Mechanical Room. The mechanical contractor will continue ceiling diffuser installation on level 1. The mechanical contractor will continue setting radiant panels into completed ceiling grid on level 1. The mechanical contractor will continue making final connections to the entry vestibule cabinet unit heaters. The mechanical contractor will continue final duct connections to the roof top units. The electrical contractor will continue installation and wiring of level 1 admin area, media center, and cafeteria light fixtures. The electrical contractor will continue fire alarm finish installation on level 1. The electrical contractor will continue making final electrical wiringing connections in the main electric room. The fire protection contractor will continue setting fire protection heads into completed ceilings on level 1 and Media Center. The tile contractor will continue level 1 corridor and admin area tile. The tile contractor will continue level 1 group bathroom floor and wall tile. The specialties contractor will continue markerboard and tack board installation in the level 2 and level 1 classrooms. Read more